Excavation of pressurized water conveyance tunnel Uma Oya project, using double shield tunnel boring machines
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | Sinhalese |
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nab a2200000 4500 | ||
---|---|---|---|
005 | 20200713111431.0 | ||
008 | 200713b ||||| |||| 00| 0 sin d | ||
015 | |2 SLPAI |a 202001 | ||
040 | |b ENG | ||
041 | |a ENG | ||
082 | |2 23 |a 627.8 | ||
100 | |9 55433 |a Isuru, Indunil H.W | ||
245 | |a Excavation of pressurized water conveyance tunnel Uma Oya project, using double shield tunnel boring machines |c / H.W Isuru Indunil. | ||
653 | |a Hydraulic engineering. | ||
773 | 0 | |0 232219 |9 1800047 |d Colombo : Central Engineering Consultancy Bureau, 2019. |o 1076759 |t Proceeding of CECB Symposium 2019. |g Nov., 2019.- 67-74p. | |
942 | |c JNLARTICLE | ||
999 | |c 235567 |d 235567 |